Evaluation of the effect of qualitative variables in forecasting Cost Estimate At Completion of projects
Mohammad Mahdavi mazdeh Dr , Morteza Bagherpour Dr, Azadeh Soofey pour
Iran University of Science and Technology
Abstract:   (10670 Views)
Accurate forecasting of an ongoing project cost is a major issue in project monitoring. One of the challenges faced by project managers is selection of the most accurate cost Estimate at Completion (EAC) method to improve tracking their projects. To assist in the task, This research considers the effect of some qualitative variables such as delay in payment, weather condition and material availability in the model. Besides, one forecasting algorithm is presented to obtain more accurate solutions. The model is successfully implemented through a case study.The results for model are shown to be sufficiently reliable for general application of the forecasting method.
Keywords: Cost, Earned Value Management, Estimate At Completion, Performance, Project monitoring, forecasting
Full-Text [PDF 262 kb]   (3608 Downloads)    
Type of Study: Applicable | Subject: Special
Received: 2012/10/15 | Accepted: 2013/03/3 | Published: 2019/12/2


XML   Persian Abstract   Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

mahdavi mazdeh M, bagherpour M, soofey pour A. Evaluation of the effect of qualitative variables in forecasting Cost Estimate At Completion of projects. ieijqp. 2013; 1 (2) :29-37
URL: http://ieijqp.ir/article-1-26-en.html


Volume 1, Issue 2 (2-2013) Back to browse issues page
نشریه علمی- پژوهشی کیفیت و بهره وری صنعت برق ایران Iranian Electric Industry Journal of Quality and Productivity
Persian site map - English site map - Created in 0.06 seconds with 31 queries by YEKTAWEB 4102