1. [1] Shirmohammadi, D., "Some fundamental, technical concepts about cost based transmission pricing", IEEE Trans. Power Syst., Vol. 11, No. 2, pp. 1002-1008, May 1996. [ DOI:10.1109/59.496187] 2. [2] Jing, Z., "Review of transmission fixed costs allocation methods", In Proc. IEEE Power Eng. Soc. General Meeting, Toronto, Canada, pp. 2585-2592, Jul. 13-17, 2003. 3. [3] Lai, L. L., "Power system restructuring and deregulation: trading, performance and Information Technology", John Wiley & Sons, Chichester, UK, 2001. [ DOI:10.1002/0470846119] 4. [4] Willis, H. L., Philipson, L., "Understanding Electric Utility and De-regulation", 2016. 5. [5] Perez-Arriaga, I. J., Rudnick, H., Stadlin, W. O., "International Power System transmission open access experience", Power Systems, IEEE Transactions On,Vol. 10, No. 1, pp. 554-564, 1995. [ DOI:10.1109/59.373982] 6. [6] Marangon Lima, L. M., Marangon Lima, J. W., "Invested Related Pricing for Transmission Use: Drawbacks and Improvements in Brazil", Power Tech, 2007 IEEE Lausanne, pp. 887-910, 2007. [ DOI:10.1109/PCT.2007.4538450] 7. [7] Shirmohammadi, D., "Cost of transmission transactions: An introduction", IEEE Trans. Power Syst., Vol. 6, No. 3, pp. 1006-1016, Aug. 1991. [ DOI:10.1109/59.119240] 8. [8] Marangon Lima, J. W., Oliverira, E. J., "The long-term impact of transmission pricing", IEEE Trans. Power Syst., Vol. 13, No. 4, pp. 1514-1520, Nov. 1998. [ DOI:10.1109/59.736299] 9. [9] Ponce De Leao, M. T., Saraiva, J. T., "Solvin the revenue reconciliation problem of distribution network providers using long-term marginal prices", IEEE Power Eng. Rev., Vol. 22, No. 11, pp. 55-55, 2002. [ DOI:10.1109/MPER.2002.4311814] 10. [10] Li, F., "Long-run marginal cost pricing based on network spare capacity", IEEE Trans. Power Syst., Vol. 22, No. 2, pp. 885-886, May 2007. [ DOI:10.1109/TPWRS.2007.894849] 11. [11] Rubio-Oderiz, F. J., Perez-Arriaga, I. J., "Marginal pricing of transmission services: A comparative analysis of network cost allocation methods", IEEE Trans. Power Syst., Vol. 15, No. 1, pp. 448-454, Feb. 2000. [ DOI:10.1109/59.852158] 12. [12] Li, F., Tolley, D. L., "Long-Run Incremental Cost Pricing Based on Unused Capacity", Power System, IEEE Trans on, Vol. 22, No. 4, pp. 1683-1689, 2007. [ DOI:10.1109/TPWRS.2007.908469] 13. [13] Wang , J., "Lon- run marginal cost pricing methodologies in open access electricity networks", PhD: University of Bath, 2007. 14. [14] Heng, H. Y., Li, F., "Literature review of long- run marginal cost pricing and long- run incremental cost pricing", In Universities Power Engineering Conference, 2007. UPEC 2007. pp. 73-77, 2007. [ DOI:10.1109/UPEC.2007.4468923] 15. [15] Gu, C., Li, F., "Sensitivity analysis of Long-run incremental charge based on analytical approach", In Electricity Distribution - Part1, 2009. CIRED 2009. 20th International Conference and Exhibition on, pp. 1-5, 2009. 16. [16] Kovacs, R. R., Leverett, A. L., "A load flow based method for calculating embedded, incremental and marginal cost of transmission capacity", IEEE Trans. Power Syst., Vol. 9, No. 1, pp. 272-278, Feb., 1994. [ DOI:10.1109/59.317601] 17. [17] Limpasuwan, T., Tipmabutr, S., "Comparison in varied aspects of transmission pricing used on long run average incremental cost", In Proc. IEEE/PES Asia Pacific Transmission and Distribution Conf. Exhib., pp. 1990-1995, 2002. 18. [18] Bakirtzis, A., "Comparison of two methods for long-run marginal cost-based transmission use-of-system pricing", Proc. Inst. Elect. Eng. Gen., Transm., Distrib., Vol. 148, No. 5, pp. 477-481, Sep., 2001. [ DOI:10.1049/ip-gtd:20010408] 19. [19] Méndez, V. H., "Impact of distributed generation on distribution investment deferral", Int. J. Elect. Power Energy Syst., Vol. 28, No. 4, pp. 244-252, 2006. [ DOI:10.1016/j.ijepes.2005.11.016] 20. [20] Sotkiewicz, P. M., Vignolo, J. M., "Allocation of fixed costs in distribution networks with distributed generation", IEEE Trans. Power Syst., Vol. 21, No. 2, pp. 639-652, May 2006. [ DOI:10.1109/TPWRS.2006.873112] 21. [21] Pan, J., "Review of usage-based transmission cost allocation methods under open access", IEEE Trans. Power Syst., Vol. 15, No. 4, pp. 1218-1224, Nov., 2000. [ DOI:10.1109/59.898093] 22. [22] Li, F., Tolley, D. L., "Long-run incremental cost pricing based on unused capacity", IEEE Trans. Power Syst., Vol. 22, No. 4, pp. 1683-1689, Nov., 2007. [ DOI:10.1109/TPWRS.2007.908469] 23. [23] Chenghong Gu, Furong Li, "Long-Run Marginal Cost Pricing Based on Analytical Method for Revenue Reconciliation", IEEE Trans. Power Syst., Vol. 26, No. 1, Feb. 2011. [ DOI:10.1109/TPWRS.2010.2047278] 24. [24] National Grid. Electricity Ten-Year Statement, M. T., 2013. 25. [25] Sedaghati, A., "Cost of Transmission System usage based on an economic measure", IEEE Trans on power system, Vol. 21, No. 2, May 2006. [ DOI:10.1109/TPWRS.2006.873133] 26. [26] Ponce De Leao, Saraiva, J. T., "Solving the Revenue Reconciliation Problem of Distribution Network Providers Using Long- Term Marginal Prices", Power Engineering Review, IEEE, Vol. 22, pp. 55-55, 2012. [ DOI:10.1109/MPER.2002.4311814] 27. [27] Kim, H., Baughman, M. L., "The economic efficiency impacts of alternatives for revenue reconciliation", IEEE Trans. Power Syst., Vol. 12, No. 3, pp. 1129-1135, Aug., 1997. [ DOI:10.1109/59.630452]
|