:: Volume 6, Issue 1 (9-2017) ::
ieijqp 2017, 6(1): 1-7 Back to browse issues page
Modeling Maintenance Scheduling Behavior of Power Units in Restructured Power Systems Based on Game Theory
Behnaz Dibayee1 , Mohammad Hossein Javidi Dasht Bayaz * 1
1- Ferdowsi University of Mashhad
Abstract:   (4692 Views)

Privatization of power sector and establishment of competition in power supplying process, raised unprecedented challenges in power system operation and planning fields, such as preventive maintenance scheduling which was formerly, in traditional environment, managed centrally by dispatching center. Dispatching center role having been changed in restructured power systems, power producing companies play a more important role in PM scheduling process. The conflict between dispatching center being concerned about power system reliability and stability, and power generating companies profit maximization based behavior which cannot be defined properly thorough traditional optimization theory, may be modeled satisfactory thorough Game theory approaches. In this paper, after modeling and solving PM scheduling process thorough game theory, discusses about resultant equilibrium states and predicts different power generation technologies behavior.

Keywords: maintenance scheduling, game theory, power system restructuring
Full-Text [PDF 1132 kb]   (1474 Downloads)    
Type of Study: Research | Subject: Special
Received: 2016/06/12 | Accepted: 2016/07/9 | Published: 2017/09/12
References
1. [1] Abiri-Jahromi, A., Fotuhi-Firuzabad, M., Parvania, M., “Optimized Midterm Preventive Maintenance Outage Scheduling of Thermal Generating Units”, IEEE Trans. on Power Syst., Vol. 27, No. 3, August 2012.
2. [2] Rosmaini, A., Kamaruddin, Sh., “An overview of time-based and condition-based maintenance in industrial application”, Computers & Industrial Engineering,Vol. 63, Issue 1, pp. 135-149, Aug. 2012.
3. [3] Feng, Ch., Wang, X., “A Competitive Mechanism of Unit Maintenance Scheduling in a Deregulated Environment”, IEEE Trans. on Power Syst., Vol. 25, No. 1, pp. 351 – 359, Feb. 2010.
4. [4] Manbachi, M., Mahdloo, F., Haghifam, M. R., “A New Solution for Maintenance Scheduling in Deregulated Environment Applying Genetic Algorithm and Monte-Carlo Simulation”, IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems, 2010.
5. [5] Fotouhi Ghazvini, M. A., Canizes, B., Vale, Z., Morais, H., “Stochastic short-term maintenance scheduling of GENCOs in an oligopolistic
6. electricity market”, Appl. Energy, Vol. 101, pp. 667–677, 2013.
7. [6] Min, C.G., Kim, M.K., Park, J.K., Yoon, Y.T., “Game-theory-based generation maintenance scheduling in electricity markets”, Energy, Vol. 55, pp. 310:318, 2013.
8. [7] Wang, Y., Kirschen, D. S., Zhong, H., Xia, Q., Kang, Ch., “Coordination of Generation Maintenance
9. Scheduling in Electricity Markets”, IEEE Trans. Power Syst., Vol. PP, no.99, pp.1-10, 2015.
10. [8] Latify, M. A., Seifi, H., Rajabi Mashhadi, H., “A strength Pareto evolutionary algorithm-based conflict assessment framework of electricity market participants’ objectives in generation maintenance scheduling”, European Trans. on Elec. Power, 2012.
11. [9] Kim, J. H., Park, J. B., Park, J. K., Kim, B.H., “A New Game-Theoretic Framework for Maintenance Strategy Analysis”, IEEE Trans. on Power Syst., Vol. 18, No. 2, pp.698-706, May 2003.
12. [10] Kim, J. H., Park, J. K., “A New Game-Theoretic Approach To Maintenance Scheduling Problems In Competitive Electricity Markets”, Power Engineering Society Summer Meeting IEEE, Vol. 3, pp. 1510-1515, 2002.
13. [11] Kim, J. H., Park, J. B., Park, J. K., Chun, Y. H., “Generating unit maintenance scheduling under
14. competitive market environments”, Electrical Power and Energy Systems 27, pp. 189–194, 2005.
15. [12] Chattopadhyay, D., “A Game Theoretic Model for Strategic Maintenance and Dispatch Decisions”, IEEE Trans. on Power Syst., Vol. 19, Issue. 4, pp. 2014–2021, 2004.
16. [13] Shahidehpour M. et all, "Maintenance Scheduling in Restructured Power Systems." Kluwer Academic,Publisher: Norwell, 2000.
17. [14] Conejo, A.J.; Garcia-Bertrand, R.; Diaz-Salazar, M., “Generation Maintenance Scheduling in Restructured Power Systems”, IEEE Trans. on Power Syst., Vol. 20, Issue 2, pp. 984-992, 2005.
18. [15] Barot, H. Bhattacharya, K., “Security Coordinated Maintenance Scheduling in Deregulation Based on GenCo Contribution to Unserved Energy”, IEEE Transactions on Power Systems, Vol. 23, Issue 4, pp: 1871-1882, 2008.
19. [16] Fetanat, A., Shafipour, Gh., Yavandhasani, M., Ghanatir, F., “Optimizing Maintenance Scheduling of Generating Units in Electric Power Systems using Quantum-inspired Evolutionary Algorithm based 0-1 Integer Programming”, European Journal of Scientific Research, pp. 220-231, 2011.
20. [17] Osborne, M. J., An Introduction to Game Theory, 1st edition, Oxford, Oxford University Press, 2003.


XML   Persian Abstract   Print



Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 6, Issue 1 (9-2017) Back to browse issues page