1. [1] Karimi-Arpanahia S., Jooshakia M., Moeini-Aghtaie M., et al., "Incorporating flexibility requirements into distribution system expansion planning studies based on regulatory policies", Electrical Power and Energy Systems, Vol. 118, 2020. doi:10.1016/j.ijepes.2019.105769 [ DOI:10.1016/j.ijepes.2019.105769] 2. [2] Pinto R. S., Unsihuay-Vila C., Fernandes T. S. P., "Multiobjective and multi-period distribution expansion planning considering reliability, distributed generation and self-healing", IET Generation, Transmission & Distribution, Vol. 13, pp. 219-228, 2019. [ DOI:10.1049/iet-gtd.2018.5037] 3. [3] Arasteh H., Vahidinasab V., Sepasian M. S., Aghaei J., "Stochastic system of systems architecture for adaptive expansion of smart distribution grids", IEEE Transactions on Industrial Informatics, Vol. 15, No. 1, pp. 377-389, 2019. Doi: 10.1109/TII.2018.2808268 [ DOI:10.1109/TII.2018.2808268] 4. [4] RamaKrishna T., Ballireddy R., Modi P. K., "Power system expansion planning incorporating renewable energy technologies with reliability consideration: A state of art literature", International Journal of Recent Technology and Engineering, Vol. 8, No. 4, 2019. [ DOI:10.35940/ijrte.D8034.118419] 5. [5] Alotaibi M. A., Salama M. M. A., "An incentive-based multistage expansion planning model for smart distribution 6. Systems", IEEE Transactions on Power Systems, Vol. 33, No. 5, pp. 5469-5485, 2018. doi: 10.1109/TPWRS.2018.2805322 [ DOI:10.1109/TPWRS.2018.2805322] 7. [6] Lv T., Yang Q., Deng X., et al., "Generation expansion planning considering the output and flexibility requirement of renewable energy: the Case of jiangsu province", Frontiers in Energy Research, 2020. doi: 10.3389/fenrg.2020.00039 [ DOI:10.3389/fenrg.2020.00039] 8. [7] Kim I., "Optimal distributed generation allocation for reactive power control", IET Generation, Transmission & Distribution. Vol. 11, No. 6, pp. 1549-56, 2017.
[8] Ahmadigorji M., Amjady N., "A multiyear DG-incorporated framework for expansion planning of distribution networks using binary chaotic shark smell optimization algorithm", Energy, Vol. 102, pp. 199-215, 2016.
https://doi.org/10.1016/j.energy.2016.02.088 [ DOI:10.1049/iet-gtd.2016.1393] 9. [9] Saboori H., Hemmati R., Abbasi V., "Multistage distribution network expansion planning considering the emerging energy storage systems", Energy Conversion and Management, Vol. 105, pp. 938-945, 2015. doi: 10.1016/j.enconman.2015.08.055 [ DOI:10.1016/j.enconman.2015.08.055] 10. [10] Macedo L. H., O-Vazquez M. A., Romero R., "Optimal distribution systems expansion planning for improving service restoration", IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D-LA), 2018. doi: 10.1109/tdc-la.2018.8511765 [ DOI:10.1109/TDC-LA.2018.8511765] 11. [11] Najafi-Ravadanegh S., Gholizadeh-Roshanagh R., "On optimal multistage electric power distribution networks expansion planning", International Journal of Electrical Power & Energy Systems, Vol. 54, pp. 487-497, 2014. doi: 10.1016/j.ijepes.2013.07.008 [ DOI:10.1016/j.ijepes.2013.07.008] 12. [12] Santos S. F., Fitiwi D. Z., Bizuayehu A. W., et al., "Novel multi-stage stochastic DG investment planning with recourse", IEEE Transactions on Sustainable Energy, 2016. [ DOI:10.1109/TSTE.2016.2590460] 13. [13] Munoz-Delgado G., Contreras J., Arroyo J. M., "Investment generation and network expansion planning in distribution systems considering uncertainty and reliability", IEEE Transactions on Power Systems, vol. 31, pp. 3715 - 3728, 2016. [ DOI:10.1109/TPWRS.2015.2503604] 14. [14] Arias N. B., Tabares A., Franco J. F., Lavorato M., Romero R., "Robust joint expansion planning of electrical distribution systems and EV charging stations", IEEE Transactions on Sustainable Energy, Vol. 9, No. 99, pp. 1-11, 2017. doi: 10.1109/TSTE.2017.2764080 [ DOI:10.1109/TSTE.2017.2764080] 15. [15] Ahmadi S. A., Vahidinasab V., Ghazizadeh M. S., Mehran K., Giaouris D., Taylor P, "Co-optimizing distribution network adequacy and security by simultaneous utilization of network reconfiguration and distributed energy resources", IET Generation, Transmission & Distribution, Vol. 13, No. 20, pp. 4747-4755, 2019. doi: 10.1049/iet-gtd.2019.0824 [ DOI:10.1049/iet-gtd.2019.0824] 16. [16] Verma M. K., Mukherjee V., Yadav V. K., et al., "Constraints for effective distribution network expansion planning: an ample review", Int J Syst Assur Eng Manag, 2020. doi:10.1007/s13198-020-00969 [ DOI:10.1007/s13198-020-00969-w] 17. [17] Kiani-Rad H., Moravej Z., "Using a new method to incorporate the load uncertainty into the SEP problem", Iranian Journal of Electrical and Electronic Engineering, Vol. 3, pp. 420-433, 2019. 18. [18] Wang J., Zhong H., Tang W., et al., "Tri-level expansion planning for transmission networks & distributed energy resources considering transmission cost allocation", IEEE Transactions on Sustainable Energy, Vol. 9, No. 4, 2018. [ DOI:10.1109/TSTE.2018.2816937] 19. [19] Gitizadeh M., Azizi-Vahed A., Aghaei J., "Multistage distribution system expansion planning considering distributed generation using hybrid evolutionary algorithms", Applied Energy, Vol. 101, pp. 655-666, 2013. [ DOI:10.1016/j.apenergy.2012.07.010] 20. [20] Franco J. F., Rider M. J., Romero R., "A mixed-integer quadratically-constrained programming model for the distribution system expansion planning", International Journal of Electrical Power & Energy Systems, Vol. 62, pp. 265-272, 2014. [ DOI:10.1016/j.ijepes.2014.04.048] 21. [21] Muñoz-Delgado G., Contreras J., Arroyo J. M., "Joint expansion planning of distributed generation and distribution networks", IEEE Transactions on Power Systems, Vol. 30, No. 5, pp. 2579-2590, 2015. [ DOI:10.1109/TPWRS.2014.2364960] 22. [22] Franco J. F., Rider M. R., Romero R., "Robust multi-stage substation expansion planning considering stochastic demand", IEEE Transactions on Power Systems, Vol. 31, No. 3, pp. 2125-2134, 2016. [ DOI:10.1109/TPWRS.2015.2443175] 23. [23] Abapour S., Zare K., Mohammadi-Ivatloo B., "Dynamic planning of distributed generation units in active distribution network", IET Generation, Transmission & Distribution, Vol. 9, pp. 1455-1463, 2015. [ DOI:10.1049/iet-gtd.2014.1143] 24. [24] Tabares A., Franco J. F., Franco M., Rider M. J., "Multistage long-term expansion planning of electrical distribution systems considering multiple alternatives", IEEE Transactions on Power Systems, Vol. 31, No. 3, pp. 1900-1914, 2016. [ DOI:10.1109/TPWRS.2015.2448942] 25. [25] Borges C. L. T., Martins V. F., "Multistage expansion planning for active distribution networks under demand and distributed generation uncertainties", International Journal of Electrical Power & Energy Systems, Vol. 36, No.1, pp.107-116, 2012. doi: 10.1016/j.ijepes.2011.10.031 [ DOI:10.1016/j.ijepes.2011.10.031] 26. [26] Ehsan A., Yang Q., "State-of-the-art techniques for modelling of uncertainties in active distribution network planning: A review", Applied Energy, Vol. 239, pp. 1509-1523, 2019. doi:10.1016/j.apenergy.2019.01.211 [ DOI:10.1016/j.apenergy.2019.01.211] 27. [27] K N. M., E A. J., "Optimal integration of distributed generation (DG) resources in unbalanced distribution system considering uncertainty modelling", International Transactions on Electrical Energy Systems, Vol. 27, No.1, 2017. [ DOI:10.1002/etep.2248] 28. [28] Ravadanegh S. N., Jahanyari N., Amini A., Taghizadeghan N., "Smart distribution grid multistage expansion planning under load forecasting uncertainty", IET Generation, Transmission & Distribution, Vol. 10, No. 5, pp. 1136-1144, 2016. [ DOI:10.1049/iet-gtd.2015.0673] 29. [29] Yuan W., Wang J., Qiu F., Chen C., Kang C., Zeng B., "Robust optimization based resilient distribution network planning against natural disasters", IEEE Transactions on Smart Grid, Vol. 99, pp. 1-10, 2016. 30. [30] Wang Z., Chen B., Wang J., Kim J., Begovic M. M., "Robust optimization based optimal DG placement in micro-grids", IEEE Transactions on Smart Grid, Vol. 5, pp. 2173-2182, 2014. [ DOI:10.1109/TSG.2014.2321748] 31. [31] Rastgou A., Moshtagh J., Bahramara S., "Improved harmony search algorithm for electrical distribution network expansion planning in the presence of distributed generators", Energy, Vol. 151, pp. 178-202, 2018. dio: 10.1016/j.energy.2018.03.030 [ DOI:10.1016/j.energy.2018.03.030] 32. [32] Dehghan S., Amjady N., "Robust transmission and energy storage expansion planning in wind farm-integrated power systems considering transmission switching", IEEE Transactions on Sustainable Energy, Vol. 7, pp. 765-774, 2015. [ DOI:10.1109/TSTE.2015.2497336] 33. [33] Bertsimas D., Brown D. B., Caramanis C., "Theory and applications of robust optimization", SIAM Review, Vol. 53, pp. 464-501, 2011. [ DOI:10.1137/080734510] 34. [34] Munoz-Delgado G., Contreras J., Arroyo J. M., "Distribution system expansion planning considering non-utility-owned DG and an independent distribution system operator", IEEE Transactions on Power Systems, Vol. 34, No. 4, pp. 2588-2597, 2019. [ DOI:10.1109/TPWRS.2019.2897869] 35. [35] Wang J., Hu Z., Xie S., "Expansion planning model of multi-energy system with the integration of active distribution network", Applied Energy, Vol. 253, No.1, 2019. doi: 10.1016/j.apenergy.2019.113517 [ DOI:10.1016/j.apenergy.2019.113517] 36. [36] Amjady N., Attarha A., Dehghan S., Conejo A. J., "Adaptive robust expansion planning for a distribution network with DERs", IEEE Transactions on Power Systems, Vol. 33, No. 2, pp. 1698-1715, 2017. doi: 10.1109/TPWRS.2017.2741443 [ DOI:10.1109/TPWRS.2017.2741443] 37. [37] Ahmadigorji M., Amjady N., Dehghan S., "A robust model for multiyear distribution network reinforcement planning based on information-gap decision theory", IEEE Transactions on Power Systems, Vol. 33, No.2, pp. 1339-1351, 2018. [ DOI:10.1109/TPWRS.2017.2732447] 38. [38] Jabr R. A., "Polyhedral formulations and loop elimination constraints for distribution network expansion planning", IEEE Trans Power, Vol. 28, No. 2, pp. 1888-1897, 2013. [ DOI:10.1109/TPWRS.2012.2230652] 39. [39] Ahmadigorji M., Amjady N., Dehghan S., "A novel two-stage evolutionary optimization method for multiyear expansion planning of distribution systems in presence of distributed generation", Applied Soft Computing, Vol. 52, pp. 1098-1115, 2017. [ DOI:10.1016/j.asoc.2016.09.020] 40. [40] Haghighat H., Zeng B., "Stochastic & chance-constrained conic distribution system expansion planning using bilinear benders decomposition", IEEE Transactions on Power Systems, Vol. 33, No. 99, 2017. [ DOI:10.1109/TPWRS.2017.2751514] 41. [41] Gomes P. V., Saraiva J. T., "State-of-the-art of transmission expansion planning: A survey from restructuring to renewable and distributed electricity markets", International Journal of Electrical Power & Energy Systems, Vol. 111, pp. 411-424, 2019. [ DOI:10.1016/j.ijepes.2019.04.035] 42. [42] Hamida I. B., Salah S. B., Msahli F., Mimouni M. F., "A new short-term planning strategy for multi-objective distribution network reconfiguration and optimal DG insertion", Arabian Journal for Science and Engineering, Vol. 44, pp. 6813-6826, 2019. [ DOI:10.1007/s13369-018-3645-9] 43. [43] Shayeghi H., Bagheri A., "Dynamic sub-transmission system expansion planning incorporating distributed generation using hybrid DCGA and LP technique", Electr Power Energy Syst, Vol. 48, No. 1, pp. 11-22, 2013. [ DOI:10.1016/j.ijepes.2012.11.029] 44. [44] Ai X., Wen J., Wu T., Lee W. J, "A discrete point estimate method for probabilistic load flow based on the measured data of wind power", IEEE Transactions on Industry, Vol. 49, No. 22, pp. 44-52, 2013. [ DOI:10.1109/TIA.2013.2262254] 45. [45] Guo S., Zhang F., Zhang C., Wang Y., Guo P., "An improved intuitionistic fuzzy interval two-stage stochastic programming for resources planning management integrating recourse penalty from resources scarcity and surplus", Journal of Cleaner Production, Vol. 234, pp. 185-199, 2019. [ DOI:10.1016/j.jclepro.2019.06.183] 46. [46] Verma A., Bijwe P. R., Panigrahi B. K., "Harmony search algorithm for transmission network expansion planning", IET Generation Transmission & Distribution, Vol. 4, No. 6, pp. 663-673, 2010. [ DOI:10.1049/iet-gtd.2009.0611] 47. [47] Mahdavi M., Fesanghary M., Damangir E., "An improved harmony search algorithm for solving optimization problems", Applied mathematics and computation, Vol. 188, No. 2, pp. 1567-79, 2007. [ DOI:10.1016/j.amc.2006.11.033] 48. [48] Sun W., Chang .,"An improved harmony search algorithm for power distribution network planning", Journal of Electrical and Computer Engineering, Vol. 15, No. 6, pp. 1-6, 2015. [ DOI:10.1155/2015/753712] 49. [49] Lotero R. C., Contreras J., "Distribution system planning with reliability", IEEE Transactions on Power Delivery, Vol. 26, No.4, pp. 2552-2562, 2011.
|